Laserfiche WebLink
ZV. Status of Problem Resolution <br /> The following items concern problems identified at previous inspection. Problems are classified <br /> into three categories. These are: (1) problems resolved; (2) resolution still in process; and <br /> (3) operator delinquent. The date that the problem is resolved or t-te date that the operator <br /> is deemed delinquent is to be clearly stated. <br /> PROBLEMS RESOLVED <br /> 5) The drainage ditch along the south side of Coal Creek at the prep plant area has <br /> been cleaned. <br /> 6) Coal and debris pushed over the berm adjacent to Coal Creek west of the thermal <br /> dryers has been cleaned up and the berm has been rebuilt. <br /> RESOLUTION IN PROGRESS <br /> 4) Cleanout of the upper two ponds below the prep plant must be completed by June 4, <br /> 1982. <br /> 7) An acceptable snow removal plan for' the prep plant area must be submitted by July 1, <br /> 1982. <br />