My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-11-16_INSPECTION - C1981017
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981017
>
1982-11-16_INSPECTION - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 6:43:31 PM
Creation date
6/22/2012 2:39:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Inspection
Doc Date
11/16/1982
Doc Name
InspectionReports/ Documents for year 1982
Inspection Date
11/11/1982
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO RICHARD U LAMM Governnr <br /> DEPARTMENT OF NATURAL RESOURCES <br /> D.Monte Pascoe,Executive Director <br /> ?MINED LAND RECLANIATION <br /> 423 Centennial Building,1313 Sherman Street <br /> Denver, Colorado 80203 Tel. (30�) 866-3567 <br /> David C. Shelton <br /> Director <br /> COAL INSPECTION REPORT <br /> Operation: Coal Basin Mines Inspection Date: September 15 and 16, 1982 <br /> File No. : C-017-81 Type of Operation: UG X Surface <br /> Operator Pane: Mid-Continent Resources, Inc. Federal X Private <br /> Per:-*ittee . ,:me: Same Inspector: Jim Herron <br /> Ir s: P.O. Box 158 Weather: 9/15/82 cloudy, cool; 9/16/82 sunny, <br /> warm <br /> Carbondale, Colorado 81623 Timer 9/15/82 8a.m.-3p.m. <br /> 9/16/82 8a.m.-lp.m. <br /> Type of Inspection: Complete X Partial <br /> County: Pitkin Operator Contact: Doug Bowman <br /> I. General Comments <br /> This complete inspection was conducted in the third quarter of 1982 because snow generally <br /> makes most observations difficult in the last quarter. All the drainage control systems <br /> were inspected so problems could be corrected before snow made it impossible. One other <br /> complete inspection was made this quarter in July. <br /> Brian Munson was present on a portion of the inspection, September 15, 1982, to become <br /> familiar with the Coal Basin operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.