Laserfiche WebLink
IT'. Proble:tis, Recommend_:tions and Comoliance Dates <br /> The operator is advised that the foilo:ving problems have peen identified during inspections <br /> and that -failure to correct the problems r,-,au result in the Division taking an �::FOPC Ii�NT <br /> ACTION pursuant to CRS 1973, as amended, 34-33-123. (P,ecommendations and compliance dates are <br /> to be clearly noted. Dates are to be specific, e.c. , Januarz; 31, 7992 and underlined.) <br /> 017-82-29 Sediment must be cleaned out of the preparations plant slurry pond. An original <br /> compliance date of October _1, 1982, was set but 'Ir. Bc)�-,man stated that the drarline needed <br /> to clean the pond had broken down and should be repaired soon. 'Cherefore, a new compliance <br /> deadline of _November 15, 1982, is set . It is imperative that this pond be cleaned out <br /> because if this pond fills up and overfloo.,s, it may overload the sediment ponds below the <br /> coal_ refuse pile. <br /> 017-82-45 The tipper pond of the four below the coal refuse nil_e must be cleaned by <br /> November 19, 1982. <br /> 017-82-25 Coal must be cleaned up from the undisturbed area below the 'Tine No. 2 coal <br /> stockpile when the stockpile is removed enough to facilitate cleanup. <br />