Laserfiche WebLink
Page 2 <br /> Oisoosai of Excess Rock <br /> Comments: <br /> Excess rock from development of the rock tunnel is being disposed of in the <br /> approved area. Snow should be removed prior to placement of the spoil in <br /> the disposal area. <br /> Protection of Hydrologic System <br /> Water leaving affected area <br /> Surface water monitoring <br /> Diversions temporary/permanent <br /> Stream channel diversions <br /> Sediment control/maintenance of ponds <br /> Discharge structures <br /> Acid or Toxic materials <br /> Ground water monitoring <br /> Water rights <br /> Alluvial Valley floor <br /> Permanent impounds <br /> Haul 6 access road drainage <br /> Grade <br /> Drainage Ditches <br /> Culverts erosion control <br /> Road surface material <br /> Maintenance <br /> Other transport facilities <br /> Comments: <br /> 1. The diversion was frozen over at the northwest corner of the thermal <br /> dryers , causing drainage to go directly into Coal Creek. Steps were taken <br /> immediately to alleviate this problem. <br /> 2. All ditchest 6 culverts:appeared to be functional , although snow made <br /> it difficult to evaluate their condition in many places. <br /> Dams Constructed of or Imoounding Water Materials <br /> Comments: <br />