Laserfiche WebLink
d <br /> �1. Status of Problem Resolution <br /> The following items concezzz problems identified at previous _'nsoection. Problems are classified <br /> into three categories. These are: (1) problems resolved; (2) resolut_4on still in process; and <br /> (3) operator delinquent. The date that the problem is resolved or the date that the operator <br />' is deemed delinquent is to be clearly stated. <br /> i <br /> 1. The road over Dutch Creek to the refuse pile has been regraded. Problem Resolved. <br /> 2. Topsoil markers have been placed on the stockpiles near the rock dump. Problem <br /> Resolved. P m <br /> 3. The wash plant-refuse pile perimeter ditch has been cleaned. Problem Resolved. <br /> 4. Sediment ponds below the refuse pile have been cleaned. Problem Resolved. <br /> 5. A berm and ditch system has been constructed along the West side of the wash plant. <br /> Problem Resolved. <br /> 6. The discharge pipe at sediment pond #5 has not been backfilled because of equipment <br /> breakage. Resolution Still in Progress. <br /> 7. The channel below the mine #1 and 2 sediment pond has not been redefined due to <br /> equipment breakage. Resolution Still in Progress. <br />