Laserfiche WebLink
SPECIAL CONDITIONS <br /> Coal Basin Road D Reclamation Project <br /> PKA-7-XXX <br /> PROJECT LOCATION <br /> The project is located four miles west of Redstone, in Pitkin <br /> County, Colorado. The mine is accessed via a paved service road. <br /> The road to be reclaimed in this project is located near the <br /> central portion of Coal Basin. See attached maps. <br /> WORK SUMMARY <br /> The project work will be conducted on a mine site previously <br /> permitted by the State of Colorado, Division of Minerals and <br /> Geology. The site was active as an underground mining operation <br /> from 1953 until 1991 . The Colorado Mined Land Reclamation Board <br /> revoked the mining permit and forfeited the reclamation bond. The <br /> disturbances created as a result of activities at the site since <br /> August 3 , 1977 are the subject of the reclamation activities <br /> addressed in this and subsequent Invitation to Bid documents. <br /> The project work will include grading, construction of drainage <br /> structures, construction of sediment control measures, and <br /> revegetation activities along the road surfaces and adjacent gentle <br /> slopes. <br /> PRE-BID MEETING AND SITE SHOWING <br /> A mandatory pre-bid meeting and site showing will begin at the Coke <br /> Ovens, opposite the south turnoff to Redstone on State Highway 133 . <br /> This mandatory meeting will begin on June 23 , 1997 at 10:00 a.m. <br /> (Map 2, Pre-Bid Meeting Location) . <br /> The Pre-Bid Meeting is for the purpose of showing prospective <br /> bidders the work site and vicinity. Bidders are advised to be <br /> prompt. A sign-in sheet will be available at the Pre-Bid meeting <br /> for firms to register their attendance. It is the bidder's <br /> responsibility to make certain their attendance is recorded on the <br /> sign-in sheet. Failure to sign-in or to attend the entire meeting <br /> will be cause for rejection of a bid. <br /> Bidders are cautioned that, notwithstanding any remarks or <br /> clarifications given at this meeting and site showing, all terms <br /> and conditions of the contract documents remain unchanged unless <br /> they are changed by written amendment issued by the OWNER. If the <br /> answers to questions, or any amendment to the contract documents <br /> create ambiguities, it is the responsibility of the bidder to seek <br /> 2 <br />