Laserfiche WebLink
5. Task 3, Road Grading: Road grading at switchbacks will be accomplished so that a <br /> slope of zero percent (0%) is created through the turn. PROJECT MANAGER will <br /> stake the beginning and end of each switchback, through which the grade change from <br /> seven percent (7%) to zero percent (0%) will be accomplished. <br /> 6. Task 6, Revegetation: Gouges will be created on the designated cut and fill slopes in <br /> such a manner so that they are spaced no further than eight inches (8") distant from <br /> each other in any direction. A machine, rather than hand tools, may be used to create <br /> the gouges if the specified gouge dimensions and spacing can be achieved using the <br /> machine. <br />