Laserfiche WebLink
liable for any cost of procuring the work which exceeds the amount of his bid, and the bid <br /> guarantee shall be available toward offsetting such difference. <br /> List of Equipment Offered. The List of Equipment Offered form must be returned with each <br /> bid. All equipment to be used on the project must be listed. The CONTRACTOR must own, <br /> have a current lease for the equipment intended to be used to perform the work, or must furnish <br /> a statement of arrangements to rent, or otherwise procure, adequate equipment to perform the <br /> work. Inclusion of a piece of equipment on the List of Equipment Offered represents a <br /> commitment to devote that piece of equipment to the project work for the entire duration of the <br /> project. If several contractors propose to join together to perform the work under this purchase <br /> order contract, equipment owned or controlled by each should be listed and the owner <br /> identified. A purchase order contract will not be awarded to a bidder who in the opinion of the <br /> OWNER (a) does not have adequate equipment, or (b) does not have firm and satisfactory <br /> arrangements to obtain adequate equipment to perform the work described in the Invitation and <br /> Bid. <br /> BID AWARD <br /> Award will be made with reasonable promptness, by written notice to the low responsive and <br /> responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for <br /> bid. These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, <br /> corrected if necessary for errors in price extension and/or addition, on the Bidder's equipment if <br /> a List of Equipment Offered is required with the bid, and capability to meet the performance time <br /> requirements. The GRAND TOTAL PRICE will be used for comparing bids only. <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program General Bid Specifications 1996, which <br /> include General Conditions, Standard Work Specifications, and Standard Drawings and Figures <br /> are intended to complement these Special Conditions. The Special Conditions combined with <br /> the General Bid Specifications 1996form the complete Invitation and Bid document. Please <br /> refer to the Standard Work Specifications for all applicable types of work required in the Special <br /> Conditions. The General Conditions apply to all work covered in the Special Conditions. <br /> Copies of the General Bid Specifications are available at the Pre-Bid Meeting or from the <br /> Division of Minerals and Geology (DMG), 1313 Sherman Street, Room 215, Denver, Colorado <br /> 80203 (303) 866-3567. <br /> PROJECT DATES <br /> The project is scheduled for construction between July 25, 2000 and August 25, 2000. This <br /> includes mobilization and demobilization time. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is thirty-one (31) calendar days after receipt of the <br /> Notice to Proceed. This includes mobilization and demobilization time. <br /> LIQUIDATED DAMAGES <br /> The liquidated damages for this project will be $400.00 per day. Please see General <br /> Conditions, Articles 34, 35 and 40. <br /> 3 <br />