Laserfiche WebLink
J <br /> COAL BASIN/SEDIMENT POND RECLAMATION PROJECT <br /> PKA-0-469 <br /> BID SCHEDULE <br /> Item Description Quantity Unit Unit Price Amount <br /> 1 Mobilization/ Demobilization N/A Job N/A $ <br /> 2 Corrugated Metal Pipe <br /> Removal, per Specifications N/A Job N/A $ <br /> 3 Earth Work, per <br /> Specifications N/A Job N/A $ <br /> 4 Rip Rap Placement, per N/A $ <br /> Specifications N/A Job <br /> Access Road Reclamation, $ $ <br /> 5 per Specifications 3,150 Ln. Ft. <br /> 6 Revegetation per <br /> Specifications 22 Ac. $ $ <br /> 7 Tree Planting, per <br /> Specifications 4,000 Ln. Ft. $ $ <br /> 8 Equipment Rental, per <br /> specifications <br /> A Dozer 16 Hour $ $ <br /> B Backhoe 20 Hour $ $ <br /> C Dump Truck 16 Hour $ $ <br /> GRAND TOTAL $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />