Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> PROJECT OVERVIEW <br /> The goal of this Project is to create maintenance free sediment pond dewatering devices by <br /> removing the existing corrugated metal pipe dewatering devices, and constructing rip rap lined <br /> drainage ways. Locally collected willows will be planted near the outlet of each rip rap lined <br /> drainage and along the perimeter of the ponds. Access roads near some ponds will be <br /> reclaimed, and all disturbed areas will be revegetated. Map 3, Pond Reclamation Project Area, <br /> depicts the approximate location of the ponds and other features pertinent to this Project. <br /> NOTE that volumes, distances and areas stated in this document are ESTIMATIONS <br /> ONLY. The CONTRACTORS are responsible for verifying all estimations prior to bid <br /> submittal. <br /> NOTE that the roads from the Rock Tunnel to the ponds at Mines 3 and 5(Maps 2 and 3) <br /> have previously been reclaimed. Access across these roads is restricted to low ground <br /> pressure equipment. Only one trip in and one trip out by a 3/4 ton four wheel drive pick up <br /> truck or heavier equipment will be allowed. Any damage caused to water bars, low water <br /> crossings, berms or vegetation will be immediately repaired by the CONTRACTOR at the <br /> CONTRACTORS expense. <br /> WORK TASKS 5c� <br /> The tasks included in this Project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Corrugated Metal Pipe Removal <br /> Task 3: Earth Work <br /> Task 4: Rip Rap Placement <br /> Task 5: Access Road Reclamation <br /> Task 6: Revegetation <br /> Task 7: Shrub Planting <br /> Task 8: Equipment Rental <br /> 6 <br />