Laserfiche WebLink
J <br /> COAL BASIN / SEDIMENT POND RECLAMATION PROJECT <br /> PKA-0-469 <br /> REVISED BID SCHEDULE <br /> Item Description Quantity Unit Unit Price Amount <br /> 1 Mobilization/ <br /> Demobilization N/A Job N/A $ XO.�0 <br /> 2 Corrugated Metal 60 <br /> Pipe Removal, per N/A Job N/A $ 000 <br /> Specifications <br /> 3 Earth Work, per N/A Job N/A $ <br /> Specifications <br /> 4 Rip Rap Placement, <br /> per Specifications N/A Job N/A <br /> Access Road Ln. / o co <br /> 5 Reclamation, per 3,150 Ft. $ $ 50 — <br /> Specifications <br /> 6 Revegetation per / ie <br /> Specifications 22 Ac. $ 6 3�� $ 3,G1* <br /> 7 Tree Planting, per Ln. <br /> Specifications 4,000 FT. $ ,/S $ J+boa, <br /> 8 Equipment Rental, <br /> per specifications <br /> A Dozer 16 Hour $ 70•5 $ 40. <br /> B Backhoe 20 Hour $ �5'• $ DO'I/ <br /> C Dump Truck 16 Hour $ �{D• $ ��/� •o <br /> Low Water Crossing <br /> g Construction, per 1 Each $ DD•�' $ f D0. �� <br /> Specifications <br /> 00 <br /> GRAND TOTAL $ 700(V•� <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />