My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (270)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (270)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:23:26 AM
Creation date
6/22/2012 11:04:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 2000 Ponds
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT - METAL MINING (& COAL) <br /> COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br /> Water Quality Control Division <br /> WQCD-P-B2 <br /> 4300 Cherry Creek Drive South <br /> Denver, Colorado 80246-1530 <br /> Make enough copies of forin for each reporting year. Or go to <br /> http://www.cdphe.state.co.uslwg/PermitsUnit/wgcdpmt.html <br /> Check box if this is a <br /> new name, address, etc. <br /> Permittee (Company Name): C'�/un.rno •� /%iti �•rrs �- �«leGy <br /> Facility Name: -sin/ C T7�ti ❑ <br /> Mailing Address: 1 3/3 ;zi ❑ <br /> Facility Phone Number: ( 3,3 3 s 6 ❑ <br /> Permit Certification No. COR-04 0 p- a F <br /> Reporting Period: Jan. 1-Dec. 31, 20 U I (Form is due by Feb. 15 of the following year) <br /> **Each section must be completed., Please print or type.** <br /> A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures <br /> taken to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or <br /> improvements made in any of your Best Management Practices (BMPs), employee training, spills, other <br /> problems encountered, etc. How is your plan working?) <br /> Were changes made to your SWMP? L_7 No ❑ Yes - Describe changes on a separate sheet. <br /> B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br /> taken. (The permit requires at least two comprehensive facility inspections per year for active mines, with <br /> different requirements for other sites - see page 11 of the permit. Include here a summary of those <br /> inspections, plus any other comprehensive inspections made. Do not submit separate inspection reports. <br /> Also, it is not necessary to summarize day-to-day inspections, unless significant problems were noted.) <br /> First Inspection - Date S -1 v yl01. Findings, and action taken: <br /> — —7>//e Z�-5 e-- - -S71e- h-7_Td,-4:.,9 z9�/Z; <br /> Note - form may be reproduced Page 1 of 2 ar9/01min. <br />
The URL can be used to link to this page
Your browser does not support the video tag.