Laserfiche WebLink
COAL BASIN/SUTEY DITCH 8 RECONSTRUCTION PROJECT <br /> PKA-0-459 <br /> BID SCHEDULE <br /> Item Description Qty Unit Unit Price Amount <br /> 1 Mobilization/ <br /> Demobilization N/A Job N/A <br /> 2 Ditch 8 Reconstruction, <br /> per specifications 700 Ln. Ft. $ $ <br /> 3 Feeder Channels, per <br /> specifications <br /> Feeder Channels (3) , <br /> A per specifications 123 Ln. Ft. $ $ <br /> B North Inlet Channel, Ln. Ft. $ <br /> per specifications 30 $ <br /> Adjacent Area Topsoil <br /> Application, per <br /> 4 specifications N/A Job $ $ <br /> Equipment Rental, per <br /> 5 specifications <br /> A Dozer 12 Hour $ $ <br /> B Backhoe 16 Hour $ $ <br /> C End DumpTruck 16 Hour $ $ <br /> GRAND TOTAL $ <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />