Laserfiche WebLink
} <br /> } <br /> } <br /> 1 - ' <br /> COAL BASIN/SUTEY DITCH 8 RECONSTRUCTION PROJECT <br /> PKA-0-459 <br /> Item Description Qty Unit Unit Price Amount <br /> 1 Mobilization/ <br /> Demobilization N/A Job N/A 983.00 <br /> 2 Ditch 8 Reconstruction, <br /> per specifications 700 Ln. Ft. $ 14.15 $ 9.905-00 <br /> 3 Feeder Channels, per <br /> specifications <br /> Feeder Channels (3) , Ln. Ft. <br /> A per specifications 123 $- <br /> B 18.50 $ 2,275.00 <br /> North Inlet Channel, Ln. Ft. 43.50 1,305.00 <br /> per specifications 30 $ $ <br /> Adjacent Area Topsoil <br /> Application, per <br /> 4 specifications N/A Job $ 1.400.00 $ 1,400.00 <br /> Equipment Rental, per <br /> 5 specifications <br /> A Dozer 12 Hour $ 1 0.00 $ 1,320.00 <br /> B Backhoe 16 Hour $ 80:00 $ 1,280.00 <br /> C End DumpTruck 16 Hour $ 70.00 $ 1,120 <br /> GRAND TOTAL $19,588.00 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />