"eck Slots shall be ',installed on forty feet, raTl er t,an fifty feet , centers; <br /> - Overlap of adjacent mats will be four inches (4"), rather than three inches (Y); <br /> - Apply center mat first, then install adjacent mats to the outside of the ditch; <br /> - The mat must extend a minimum of three and one quarter feet (3.25) outward from <br /> each ditch crest. <br /> After installation of the lower liner, an additional three inches (3") of soil shall be placed <br /> over the top of the lower liner from the outside edge of the liner on the west side to the <br /> outside edge of the liner on the east side. Rocks, clods, dips and bumps will be <br /> removed from the soil surface to ensure that a uniform soil surface is created. This <br /> upper soil surface must have no topographic variations, and it must be level from side to <br /> side as measured perpendicular to the direction of flow. Raking of the soil surface is <br /> required in order to achieve the desired degree of uniformity. <br /> During topsoil application, ten feet (10') long, twelve-inch (12") diameter Excelsior Logs, <br /> or approved equivalent, shall be installed within the ditch. These logs shall be placed on <br /> fifty feet (50) centers, perpendicular to the direction of flow. The logs shall be placed so <br /> that they extend evenly up each side slope for approximately two and one half feet (25). <br /> Each log shall be placed so that it is in contact with the lower liner, and then staked in <br /> place using a minimum of eight (8), two foot (2') long willow cuttings obtained locally by <br /> CONTRACTOR. The minimum diameter of the willow cuttings shall be one and one half <br /> inches (1.5"). Four (4) stakes shall be installed at the base of each log, and two (2) on <br /> each side slope. A rubber hammer shall be used to drive the stakes into the ground. <br /> The end of the stakes shall be cut on a forty five degree (45°) angle following installation, <br /> so that any damage which results from driving the stakes into the ground, is cut off. <br /> Six inches (6") of soil shall be uniformly placed against the logs on their upstream side, <br /> while sufficient soil must be made available to ensure that the three inches (3") of topsoil <br /> placed over the lower liner is in place and in contact with the log on the downstream <br /> side. <br /> Seed and fertilizer may not be applied until a uniform topsoil surface has been achieved, <br /> and the logs have been installed and accepted. <br /> Upon completion and acceptance of topsoil application and log installation, diammonium <br /> phosphate fertilizer (18-46-0) shall be applied at a rate of 300 pounds per acre. The <br /> fertilizer shall be supplied by the CONTRACTOR. Seed, to be provided by PROJECT <br /> MANAGER, will be broadcast applied at the rate of ten pounds (10#) per acre. <br /> After seeding and fertilization is complete and accepted, a soil stabilization mat, or <br /> upper liner, shall be installed. Permamat 200f is supplied with an upper liner. If a <br /> different liner system is proposed for use, the upper-liner must be equivalent to a <br /> temporary stabilization blanket such as Xcel Excelsior Blanket - Superior. The fabric shall <br /> be installed as per manufacturer's specifications. <br /> Pinning of the upper liner immediately below the Excelsior logs, or approved equivalent, <br /> shall be on eighteen-inch (18") centers at the downstream contact of the log, topsoil and <br /> liner. <br /> 10 <br />