areas. It is anticipated that no more than two hundred feet (200') of silt fence and fifteen to <br /> twenty (15 to 20) bales of straw will be used. Straw bales must conform to the weed free <br /> specifications described in Task 4, below. Sediment control during and following <br /> construction shall be accomplished at the direction of PROJECT MANAG;=R. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a <br /> lump sum bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs <br /> fort Mobilization and Demobilization. Payment shall be made as described in General <br /> Bid Specifications 1996, Specification 1.0, Mobilization / Demobilization. <br /> TASK 2 DITCH 8 RECONSTRUCTION <br /> A drainage ditch was constructed on the south facing portion of the Sutey Refuse Disposal <br /> Area in 1995. This ditch (old Ditch 8) did not function as desired, and will be <br /> reconstructed. Ditch 8 will consist of a fabric-lined channel extending down the south- <br /> facing side of the facility for a length of approximately 700 feet. When completed, this <br /> ditch will be trapezoidal in shape, the base being no less than five feet (5') in width and the <br /> side slopes being no steeper than 2 H : 1 V. The width of the ditch as measured from <br /> crest to crest will be no less than sixteen feet(16'), and the total depth of the ditch as <br /> measured from the base to the crest will be no less than two feet (2.0'). The attached <br /> cross sections depict Ditch 8 construction. Large rock encountered in the channel during <br /> excavation of Ditch 8 shall be removed from the channel, and stockpiled near the bottom <br /> of Ditch 8 in a location to be specified by the PROJECT MANAGER. <br /> Current Conditions <br /> The existing drainage ditch is slightly incised into the relatively hard underlying Mancos <br /> Shale. A synthetic mat or liner is in place, at the base of the ditch. Periodically, the mat is <br /> exposed, while in many cases it is buried by a thin layer of soil. The mat was anchored to <br /> the underlying substrate by wood and possibly metallic stakes. Numerous logs and larger <br /> rock have been placed into the ditch since its construction. <br /> Three small ditches, which drain the south and southwest portions of the refuse pile, report <br /> to the 008 ditch along its western margin. Biodegradable liner was placed in these small <br /> ditches when they were constructed in 1995. The liners may or may not still be in <br /> existence. <br /> Two shallow feeder ditches were constructed, and report from the north and northwest to <br /> facilitate drainage from near the top of the refuse pile to the 008 ditch. Biodegradable liner <br /> was placed in these small ditches when they were constructed in 1995. The liners may or <br /> may not still be in existence. <br /> t <br /> Construction <br /> The new channel will be constructed immediately to the east of the existing ditch. The <br /> minimum excavated dimensions of the ditch prior to liner or topsoil installation shall be as <br /> follows: <br /> - The base of the ditch shall be six and one half feet (6.5') in width; <br /> - Depth, from base to crest, shall be two and eight tenths feet (2.8'); <br /> 8 <br />