My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (277)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (277)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:33:10 AM
Creation date
6/22/2012 10:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)2000 Sutey Ditch 8
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l \yC <br /> STATE OF COLORADO <br /> x 6 Labor and Material Payment Bond <br /> PROJECT NO. PKA-o-459 <br /> KNOW ALL MEN BY THESE PRESENTS: <br /> That the Contractor <br /> RM CAT ENVIRONMENTAL SERVICES, INC. <br /> 1040 A Elkton Drive <br /> Colorado Springs, Colorado 80907 <br /> as Principal and hereinafter called "Principal," <br /> and <br /> Highlands Insurance Company <br /> 8753 Yates Drive #200-5 <br /> Westminster, Colorado 80030 <br /> as Surety and hereinafter called "Surety," a corporation organized and existing under the laws of the <br /> State of Texas are held and firmly bound unto the STATE OF COLORADO acting by and through <br /> The Department of Natural Resources, Division of Minerals and Geology <br /> hereinafter called"Principal Representative," and to all subcontractors and any others who have supplied or fur- <br /> nished or shall supply or furnish materials, rental machinery,tools,or equipment actually used in the performance <br /> of the hereinafter identified Contract,or who have performed or shall perform labor in the performance of or in con- <br /> nection with said Contract, hereinafter called "Obligees" in the sum of Nineteen Thousand Five <br /> Hundred Eighty Eight and No/100 ------------- Dollars ($19,588.00 ) <br /> together with interest at the rate of eight per cent (8%) per annum on all payments becoming due in accordance <br /> with said Contract, from the time such payments shall become due until such payment shall be made, for the pay- <br /> ment of which, well and truly made to the Obligees, the Principal and the Surety bind themselves, their,heirs, <br /> executors, administrators, successors and assigns, jointly and severally, firmly, by these presents. <br /> WHEREAS,the Principal and the State of Colorado acting by and through the Principal Representative have entered <br /> into a certain Contract, hereinafter called"Contract," dated June 2 +9r .2 ooa for <br /> the construction of a PROJECT described as <br /> Coal Basin/Sutey Ditch 8 Reconstruction Project <br /> which Contract is hereby by reference made a part hereof; <br /> 395-01-01-2210 <br /> DC-321"5 (Over) <br />
The URL can be used to link to this page
Your browser does not support the video tag.