Laserfiche WebLink
MA OAR.23.20001 . 2�28P) RDI��MINERALS&GEOLOGY F 7667262e� NO.633 P.2/6 - 92 <br /> Coal Basin /2000 Sprltlg Maintenance Protect <br /> FKA-0-1079 <br /> BID SCHEDULE <br /> Qtyl (Eat. <br /> Item Description total units) Unit Pica Total Cost <br /> 1 D60 Dozer/140 fhp equivalent w/operator <br /> Including mobldemob <br /> la 1361) Dozer/140 fhp equivalent w/operator 2d S 1,8 S 1hr S <br /> 2 4168 backhoelloader or 62 fhp equivalent C� <br /> w/operator including mobldemob e $— �-� $ „ <br /> 2a 416B backhoelioader or fit fhp equivalent 24 b / r $ <br /> w/operator <br /> 3 10 cubic yard onloff highway dump truck ae <br /> w/operator including mobldemob e S 40 /hr <br /> 30 10 cubic yard on/of highway dump truck a <br /> w/operator <br /> 4 Prefabricated silt fence per(Neal foot installed <br /> Including mobldemob 100 $ • 9 /�Ft 3 s <br /> 48 Prefabricated Silt fence per lineal foot installed <br /> 100 SQ, /L.Ftt <br /> 5 Straw Bales With rebar per bale installed 25 S Id ale S e-� <br /> including mobldemob me <br /> 5a Straw Sales with rebar per bale installed <br /> 25 $ 6 <br /> 6 Rip Rap, per specifications, Installed Including n <br /> mob/demob 25 5/.� nL_' S <br /> r.c� � o <br /> 6a Rip Rap, per specifications, insl�lled 25 S � <br /> 'For bid evaluation only, Quantities aro NOT guaranteed GRAND TOTAL. $ <br /> O o0 <br /> Contractor Date 3 400ol --- <br /> fA <br /> 629 <br /> Signature Phone „(a�n�� <br /> Address 1t 6 <br /> iTn L. CO n 3 41.9 Tax <br /> THIS BID SCHEDULE <br /> Pg 1 of RETURNED <br /> \MTH YOUR 810 <br /> a <br />