Laserfiche WebLink
Date: 6//1/Z0/ 2 <br />3. List any additional changes to the original prospecting and reclamation plan or <br />any unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />Artesian flow was encountered in holes CCU064 and 071. The fractured sandstone <br />was grouted to seal the artesian conditions. Artesian tlow was also encountered in <br />CCl <br />10R7 This hole. has hAPn conve.rtAri to a water WPM and permittAri limier the. <br />Colorado Department of Water Resources. <br />4. When do you expect to complete all exploration and reclamation activities for <br />this project? <br />All activities have been completed <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />2.02.7(2). No If yes, attach a justification for the request. <br />6. Additional Comments: <br />ignature of Authorized Representative <br />Peabody Sage Creek Mining, LLC <br />Company <br />