Laserfiche WebLink
Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />400.00 <br />5.00 <br />8.00 <br />13.00 <br />565 <br />0.726 <br />2 <br />1500.00 <br />15.00 <br />8.00 <br />23.00 <br />320 <br />4.676 <br />3 <br />1500.00 <br />0.00 <br />8.00 <br />8.00 <br />902 <br />1.708 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />1500.00 <br />-15.00 <br />8.00 <br />-7.00 <br />3064 <br />0.544 <br />2 <br />400.00 <br />-5.00 <br />8.00 <br />3.00 <br />2936 <br />0.137 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Return Route: <br />Task # MO1 <br />Haul Time: <br />Return Time: <br />7.110 <br />0.681 <br />minutes <br />minutes <br />Total Truck Cycle Time: 11.389 minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 527.82 LCY/Hour Adjusted for job efficiency: 438.09 LCY/Hour <br />Truck Unit Production <br />115.25 LCY/Hour Adjusted for job efficiency: 95.65 LCY/Hour <br />Optimal No. of Trucks: 5 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 382.61 LCY/Hour <br />Adjusted single truck/loader team production: 382.61 LCY/Hour <br />Adjusted multiple truck/loader team production: 382.61 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 152.04 Hours <br />Unit cost: $1.710 /LCY Total job cost: $89,528.43 <br />CIRCES Cost Estimating Software <br />