Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />M01 <br />MO2 <br />M03 <br />M04 <br />M05 <br />SO 1 <br />SO2 <br />S03 <br />TO1 <br />Place Black Schist for S. Benches; N &NE 2.5:1 <br />Reclaim Slopes <br />TRUCKI <br />1■1 <br />152.04 <br />$89,528.43 <br />$1,585.89 <br />$14,869.77 <br />$5,547.10 <br />$14,951.97 <br />$13,617.09 <br />$3,319.25 <br />$4,555.10 <br />$7,611.40 <br />Grade & Rip South Benches ONLY & Pit Floor <br />DOZER <br />7.44 <br />Grade North & NE Pit Slopes with to 2.5:1 <br />DOZER <br />69.79 <br />Revege South Benches ONLY & Pit Floor <br />REVEGE <br />0.00 <br />Revege N & NE 2.5:1 Reclaimed Pit Faces <br />REVEGE <br />0.00 <br />Grade 75,000 tons of waste process sand <br />DOZER <br />68.13 <br />Grade lft Brown Schist Cover Over Stockpile Site <br />DOZER <br />16.61 <br />Revege Stockpile Site <br />REVEGE <br />0.00 <br />MOB/DEMOB <br />MOBILIZE <br />5.32 <br />SUBTOTALS: <br />319.33 <br />$ $155,586.00 <br />COST SUMMARY WORK <br />Task description: Cost Summary <br />Permit Action: DRMS Bond <br />Site: Mica White Estimate Permit/Job#: M1992058 <br />PROJECT IDENTIFICATION <br />Task #: C01 State: Colorado <br />Date: 5/22/2012 County: Fremont <br />User: TC1 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $3,142.84 <br />Performance bond: 1.05 Total = $1,633.65 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $15,558.60 <br />TOTAL 0 & P = $20,335.09 <br />CONTRACT AMOUNT (direct + O & P) = $175,921.09 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />0.00 <br />5.00 <br />Abbreviation: None <br />Filename: M058 -001 <br />Total = <br />Total = <br />0.00 <br />$0.00 <br />$8,796.05 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $29,131.14 <br />TOTAL BOND AMOUNT (direct + indirect) = $184,717.14 <br />