Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />E l u t e ment <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.33 <br />NA <br />0.33 <br />NA <br />2.66 <br />2.00 <br />Mobilization Worksheet Cont'd Task # TO1 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: CANON CITY <br />Total one -way travel distance: 45.00 miles <br />Average Travel Speed: 45.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$7,333.44 <br />$277.96 <br />Total job cost: $7,611.40 <br />5.32 Hours <br />CIRCES Cost Estimating Software <br />