Laserfiche WebLink
REVISED BID SCHEDULE <br /> Coal Basin Mine / Flume Area Reclamation Project <br /> P KA-2-487 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $ <br /> specifications <br /> 14 000.00 <br /> 2 Site Preparation, per 1 Job N/A $ <br /> s ecifications 5,000.00 <br /> 3 Underdrain Construction, per 1 Job N/A $ <br /> specifications 10,200.00 <br /> 4 Earthwork, per specifications 1 Job N/A $ <br /> 32 500.00 <br /> 5 Topsoil Application and Surface 10,625.00 <br /> Roughening, er specifications 1 Ac. $ $10,625.00 <br /> 6 Shrub Planting, per specifications - <br /> 85 Clump $11.00 $ 935.00 <br /> Revegetation, per specifications 1,400.00 <br /> 7 1 Ac. $ $ 1,400.00 <br /> Tree Planting, per specifications <br /> g 300 Tree $9.5n $ 2 ,850.00 <br /> 9 Post Construction Sediment <br /> Control, per specifications 500 Feet $3.00 $ 1 500.00 <br /> Equipment Rental, <br /> 10 per specifications <br /> a Bulldozer, w/operator 24 Hours $ $ <br /> b Backhoe Loader, w/operator 24 Hours $ $ <br /> .00 2 .00 <br /> c Laborer with specified equipment <br /> 40 Hours $30.00 $ 1,200.00 <br /> Fence Construction, per <br /> 11 Specifications 800 Ln. Ft. $6.00 $ 4,800.00 <br /> Import Aggregate, per <br /> 12 specifications 150 Yards $18.00 $ 2,700.00 <br /> GRAND TOTAL $ 91,550.00 <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 <br /> C:%sg6c1bsnF1umeam4 <br />