Laserfiche WebLink
REVISED BID SCHEDULE <br /> Coal Basin Mine / Flume Area Reclamation Project <br /> PKA-2-487 <br /> BID SCHEDULE <br /> Task Description Qty. Unit Unit price Amount <br /> 1 Mobilization/Demobilization per 1 Job N/A $ <br /> specifications (ol (000. <br /> Go <br /> 2 Site Preparation, per 1 Job N/A $ <br /> specifications 18 ,p <br /> 3 Underdrain Construction, per 1 Job N/A $ <br /> specifications Q <br /> 4 Earthwork, per specifications 1 Job N/A $ <br /> 5 Topsoil Application and Surface <br /> Roughening, per specifications 1 Ac. $ $ o oeCl.Oo <br /> 6 Shrub Planting, per specifications <br /> 85 Clump $53. $ Ore.on <br /> Revegetation, per specifications o1Z. o.cep <br /> 7 1 Ac. $ $ o?5120D <br /> Tree Planting, per specifications a 5,ao <br /> 8 300 Tree $ $ 506•00 <br /> 9 Post Construction Sediment <br /> Control, per specifications 500 Feet $ ,pU $ 1 5 DO <br /> Equipment Rental, <br /> 10 per specifications <br /> a Bulldozer, w/operator 24 Hours $ $ <br /> / .oO4 1 14 <br /> b Backhoe Loader, w/operator 24 Hours $ $ <br /> C Laborer with specified equipment I 500-00 <br /> 40 Hours $ 3�,50 $ <br /> Fence Construction, per <br /> 11 Specifications 800 Ln. Ft. I $ 10-00 $ 8 060 <br /> Import Aggregate, per 53 oo <br /> 12 specifications 150 Yards I $ $ 7, g5o.00 <br /> GRAND TOTAL $ �al�077. Oa <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 <br /> C:\sgrlclbsn Flumeam4 <br />