My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (258)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (258)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:00:46 AM
Creation date
6/21/2012 1:57:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Stabilization CBNP
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG—D2-04 12:16 FROM-Colorado Division of Minerals & Geology +13038663587 T-267 P-004/006 F-280 <br /> noxious weed free or noxious weed seed free by any authorized State or County Officer. <br /> Documentation of certification must be provided to the Project Manager RAPE to delivery <br /> of mulch. Mulch will be applied at the rate of two (2)tons per acre. The mulch must be <br /> anchored to the ground surface either by hand or through the use of a tackifier. <br /> Measurement and Payment <br /> Measurement and payment for this Task will be on a lump sum basis. The rehabilitated <br /> roadways will be paid at the lump sum price bid on the Bid Schedule Item 9. The price <br /> bid shall include all costs for labor,materials, equipment and all other items necessary for <br /> road rehabilitation as described in these specifications, including scarification of the <br /> roads,repair of low water crossings and water bars, and revegetauon. Payment for this <br /> task will be made only for the price shown under Item 9 of the Bid Schedule. Payment <br /> shall be as this task is completed and approved by the Project Manager. <br /> Task 10-Additional Bid Items <br /> There several additional bid items on the Revised Bid Schedule. These bid items are <br /> NOT guaranteed, and will be used only at the discretion of the Project Manager. The <br /> additional bid items for this project,to be completed as specified in the tasks above, <br /> include: <br /> Item No. DescriQion <br /> a. Additional slope scarification,per specifications of Task 3. <br /> b. Additional,tree planting per Specifications of Task 5. <br /> C. Additional, shrub planting per Specifications of Task 6. <br /> d. Additional, revegetaton per Specifications of Task 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.