My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (258)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (258)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:00:46 AM
Creation date
6/21/2012 1:57:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Stabilization CBNP
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HG42-04 12:16 FROM-Colorado Division of Minerals & Geology +13039863567 T-267 P-002/006 F-280 <br /> STATE OF COLO&ADo- <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources 41, <br /> CO LORADO <br /> 1313 Sherman St.,Room 215 D t v i 5 1 o N o f <br /> Denver,Colorado 80203 MINERALS <br /> Phone:(303)8663567 GEOLOGY <br /> FAX:(303)832-8106 <br /> RECLAMATION-MINING <br /> SA!LTT.5CIENCE <br /> Bill ow,ns <br /> MEMORANDUM <br /> �7�T 7� Govern w <br /> MEMORAND V M Russell rjeofXe <br /> Executi,c Director <br /> TO: Coal Basin Mine Slope Stabilization Project Bidders Ronald'.v.Cattany <br /> Division Director <br /> Natural Resource Trustee <br /> FROM: Steve Renner <br /> Division of Minerals and Geology <br /> DATE: August 2, 2004 <br /> RE: Amendment No. 1 to Coal Basin Project, PICA-5-545 <br /> Thank you for attending the pre-bid meeting on July 29.2004. A copy of the attendance <br /> list is attached. -A revised bid schedule is also attached. <br /> Please note the following clarifications and amendments to the Coal Basin Mine Slope <br /> Stabilization Project Invitation and Bid: <br /> 1. Additional acreage is being added to the Project. Please see Task 10, below. <br /> 2. The maximum allowable width of access trails across previously reclaimed <br /> roads is approximately eight feet (8') approximately the outside width of a D- <br /> 4 dozer. All equipment,including trucks, mdlers and All Terrain Vehicles, <br /> must confine their travel to this eight feet(8')wide track. <br /> 3. Road Rehabilitation measurement and payment is being changed to a Lump <br /> Sum unit. Please see Revised Task 9,below. <br /> 4. The requirement for the mulch to be bundled in 800 to 1,000 pound bales is <br /> deleted. The weight of the individual bales will not be measured. The <br /> re uirement for the mulch to consist of certified noxious weed free or noxious <br /> weed seed free Slender Wheat ass remain unchanged- The amount of male hi <br /> to be placed remains at 2,000 pounds per acre. <br /> All terms and conditions of the Invitation and Bid other than as changed by this <br /> amendment remain the same. Receipt and acceptance of this amendment must be <br /> acknowledged on the bid submittal form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.