Laserfiche WebLink
Coal Basin Billing 10/29/2004 ; <br /> Contract#PKA-4-545 ,n <br /> 4- <br /> Task Description qty unit unit price Contract Amot#19421 #19184 #19581 #19232 #19244 #19653 Total Billed <br /> 1 Mob/demob 1 job $34,780.00 $ 34 780.00 $23,187.00 $11 593.00 $34 780.00 0, <br /> 2 Safely Plan 1 'ob $ 1,890.00 $ 1,890.00 $1,890.00 $1,890.00 <br /> 3 Slope Scarify 16.8 ac $ 1,240.00 $ 19,592.00 $6,200.00 $13,392.00 $992.00 $20,584.00 <br /> 4 Straw Wattlef 2000 tin f $ 4.80 $ 9,600.00 $9,600.00 $9,600.00 <br /> 6 Tree Plant" 2000 ste $ 4.20 $ 8,400.00 $6,300.00 $6 300.00 0 <br /> 6 Shrub Planti 4000 star $ 4.49 $ 17,960.00 $17,960.00 $17,960.00 � <br /> 7 Reve etation 15.8 ac $ 7,770.00 $ 122 766.00 $122,766.00 $6,216.00 $128 982.00 <br /> 8 Hand Labor 160 Hr $ 57.10 $ 9,136.00 $7,898.64 $1 237.36 $B18.24 $9,954.24 <br /> 9 Road Rehab 1 'ob $ 7,450.00 $ 7,450.00 $2,652.50 $4,887.60 $7,540.00 <br /> CO3 Addl Revege 0.8 ac $ 7,770.00 $ 6,216.00 0 <br /> CO3 Addl Slope Si0.8 ac $ 1,240.00 $ 992.00 <br /> C04 Added hand 1 32 $ 67.10 $ 1,627.20 <br /> C04 jAdded Dozer 5 hr $ 110.00 $ . 660.00 $550.00 <br /> Total $29,387.00 $55,150.64 $128,545.86 $16,480.50 $8.576.24 <br /> Less Retaina a $2,938.70 $6,516.06 812 854.59 $1,648.05 $857.62 <br /> Grand Total $ 241,159.20 $26,448.30 $49,635.58 $116,691.27 $14,832.45 $7,718.62 $23,891.02 $238,217.24 q <br /> Hours not used and trees not Planted $3,108.96 <br /> n <br /> Note: Invoices 1-5 have 10%retainage withheld.This is paid on Invoice 96 0 <br /> 0 <br /> Note: Item#5 required 2000 trees,we only supplied and planted 1500. This resulted in the reduction of total contract by$2100 <br /> Also Additional Hand Labor was only 14.33 hours instead of 32 reducing the total contract by$1008.95 <br /> cc <br /> Cn <br /> Cn <br /> cc <br /> Cn <br /> N_ <br /> CM <br /> CM <br /> O <br /> O <br /> O <br /> r <br /> T <br /> O <br />