Laserfiche WebLink
SAFETY PLAN <br /> JOB SAFETY ANALYSIS FOR: <br /> COAL BASIN. COLORADO <br /> SEPTE'MBER-OCTOBER 2004 <br /> Work Description: Construction of small shelves and benches, installation of vegetative <br /> barriers,provision gr d planting of containerised trees and shrubs,installation.of willow <br /> wattles. <br /> Satellite Phone: Crm will carry'a satellite phone for duration of project in case any <br /> E in tergen cies arise. <br /> Hazard: Fire <br /> Action: Eacl.,ruck will, carry a fire extinguisher <br /> Hazard: Injui y, <br /> Action: Eact.-ruck will carry a first aid kit. One trained Medic First Aid persona <br /> will b;part of the crew <br /> Hazard: Work.ng on steep,rocky slopes <br /> Action: Make sure that good footing is established.If necessary,install anchor <br /> nods, end use safety ropes and harnesses, along with climbing helmets. An <br /> extr,L pope setup should be established in case of emergency. <br /> Line �gut on slope to avoid licking rocks loose onto co-workers. <br /> Hazard: High xtitude.Altitude Sickness_ Site is at 10,000 feet. <br /> Sym l towns: Headache,nausea,vomiting, and trouble sleeping. Feels like <br /> the 'f.u".Most people experience the symptoms of A.M.S. in the first <br /> tbres iays after arrival. The symptoms usually go away by the fourth day. <br /> Action: 1.A v)id Alcohol, sleeping pills or narcotics,they may decrease <br /> vent it ation, intensify bypoxemia and make symptoms worse. <br /> 2. D ri nk plenty of fluids. <br /> 3.Exi high.-carbohydrate foods,while avoiding fatty stuff <br /> 4.Do not over-do on,your first day or two. <br /> 5. R e•urn.to lower altitude. <br /> Hazard: PPE <br /> Action: Star d and PPE practices will apply. The use of hard hats, safety glasses, <br /> l.eatl is r boots, gloves, <br /> Hazard: Use c f hand tools-strenuous and repetitious work, sharp tools. <br />