My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (257)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (257)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:59:58 AM
Creation date
6/21/2012 1:57:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Stabilization CBNP
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER COLORADO DIVISION OF <br /> Whereas,authority exists in the Law and Funds have been budgeted,appropriated and otherwise made available and a MINERALS AND <br /> sufficient uncommitted balance thereof remains available for encumbering and subsequent payment of this contract under: GEOLOGY <br /> Encumbrance Number in Fund Number Appr GBL 1313 Sherman St. Rm.215 <br /> Denver, CO 80203 2273 <br /> 303 866-3567 <br /> Project Name Date <br /> Coal Basin Mine/Slope Stabilization Project October 6,2004 <br /> Contractor Name Bid# <br /> Bitterroot Restoration PKA-5-545 <br /> Contractor Address Agreement# <br /> 445 Quast Lane <br /> Corvallis, Montana 59828 Vendor ID <br /> Project Manager Change Order# 1 <br /> Steve Renner <br /> The following changes are hereby made to the Agreement include the cost/time adjustment for each change) <br /> (1) Scarify and revegetate, 0.8 additional acres at Project Area. Scarify (Task 3) @ 0.8 ac @ $1,240 /ac= $992; <br /> Reve etate Task 7 0.8 ac @ $7,770/ ac= $6,216. Total to scarify and reve etated 0.8 ac is $7,208.00. <br /> (2) Provide additional 32 hours of hand labor(32 hrs @ $57.10 / hr. = $1,827.20) (Task 8 <br /> (3) Using dozer, upgrade road drainage dips as directed. 12 hours @ $110 / hour= $1,320 <br /> Justification <br /> (1) Additional highly erosive areas were identified. These areas may be stabilized via slope scarification and <br /> reve etation per specifications of Tasks 3 and 7 of Bid. <br /> (2) Additional gully stabilization is required to complete erosion control efforts at Project Area. Hand labor with <br /> required tools Task 8 of Bid will complete the necessary erosion control work. <br /> (3) Some existing drainage dips on the reclaimed road network require upgrading with heavy equipment to restore <br /> them so that they function as designed in order to reduce site sedimentation. <br /> CHANGE TO AGREEMENT PRICE: <br /> Original Agreement Price: $ 234,734.00 <br /> Current Agreement Price adjusted by previous Change Orders: $ 234,734.00 <br /> The Agreement Price due to this Change Order will be increased by: $ 10,355.20 <br /> The new Agreement Price including this Change Order will be: $ 245,089.20 <br /> CHANGE TO AGREEMENT TIME: <br /> This Agreement time will be increased by: 2 days <br /> The date for completion of all work will be: October 17, 2004 <br /> Recommended by: <br /> Date: Date: <br /> ,DMG Project Manager Principle Representative <br /> Accepted by: Date: <br /> Date: ,for State Buildings and <br /> ,Contractor Real Estate Programs <br /> Approved by: <br /> Date: Date: <br /> DMG Project Supervisor I for the State Controller <br /> Revised 11/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.