My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2012-06-20_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:25 PM
Creation date
6/21/2012 12:38:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
6/20/2012
Doc Name
Agree to Postpone Topsoiling and Seeding
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
TR46
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />June 20, 2012 <br />Roy Karo <br />Seneca Coal Company, LLC <br />P.O. Box 670 <br />Hayden CO 81639 <br />RE: Yoast Mine (Permit No. C 1994082) <br />Technical Revision No. 46 — Pond 012 Slide Remediation <br />Topsoiling and Seeding of Pond 012 Slide Area <br />Dear Mr. Karo: <br />Last year, the Division and Seneca Coal Company (SCC) agreed to postpone topsoil redistribution and <br />seeding of the Pond 012 slide area at the Yoast Mine until 2012. The delay was warranted to protect topsoil <br />resources in the event that the area was not yet stabilized. The past winter was extremely dry and was not <br />likely a good test of whether the remediation efforts in the Pond 012 slide area were successful. In order to <br />ensure that topsoil resources would not be lost should a subsequent slide occur, it would be best to verify the <br />stability of the area under normal conditions before topsoil is replaced. Therefore, the Division recommends <br />that SCC further delay topsoil replacement and seeding until 2013. Topsoil replacement and seeding must <br />be completed no later than December 31, 2013. In the interim, it is imperative that Seneca Coal Company <br />continue to control noxious weeds on the topsoil stockpile and regraded areas even though final reclamation <br />of the areas will be delayed. <br />The 2011 Rill and Gully Map submitted by SCC indicates that the Pond 012 area will be topsoiled, and that <br />the road leading to the topsoil and slide area will be reclaimed. The Division is aware that this reclamation <br />will not occur in 2012; the map need not be revised. <br />Should you have questions or need additional information, please contact me. <br />Sincerely, <br />L 4 A1,'1, 14,.11 <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Mined Land Reclamation <br />STATE OF COLORADO <br />C OLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />—&— <br />SAF ETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E Pineda <br />Director <br />Office of Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.