My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (262)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (262)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:08:18 AM
Creation date
6/21/2012 10:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Backfilling and Grading Plan for Preparation Plant Area
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-1�3- <br /> a cr);nhinF�d storage :a;� is �,i 1 . 32 i.re-feet, of which 0.64 acre-feet is <br /> for storage of runoff From a lu-year, 24-hour storm, 0.56 acre-feet is <br /> for sediment storage, and 0. 12 acre-feet is excess storage capacity. <br /> Both ponds are designed to have 6-inch CMP principal spillways and 36 <br /> inch CMP emergency spillways capable of passing the peak Flow from 3 <br /> 25-y ear, 24-hour st,)r lr. <br /> Once the two-year coal processing is completed, an additional pond will <br /> be constructed. Once this pored is completed, the -fl* tot) Q, ponds will no <br /> longer be needed and .rill eventu o o � pr6cess ' <br /> was�The third pon is designed to have a capacity o .1 acre-feet, <br /> or wnicn 1 .25 acre-feet is for sediment storage, 1 .60 acre-feet is for <br /> storage of the runoff from a 10-year, 24-hour storm, and 0.29 acre-Feet <br /> is for excess st'oraye capacity. The pond is designed to have a 6 inch <br /> CMP principal spillway and a 36 inch CMP emergency spillway capable of <br /> passing the peak flow from a 10-year, 2-4-hour storn. <br /> All three of the sediment ponds are designed with principal spillways <br /> located at the top of the runoff storay. level . : al 1.05. E requires <br /> that pond designs provide for a "non-clogging dewatering device or <br /> conduit spillway to remove water storage resulting from inflow". In <br /> order to maintain storage for runoff From a 10-year, 24-hour <br /> precipitation event, this ;)rincipal dewatering device must he located <br /> directly above the maximum sediment storage level . Therefore, th-_ <br /> following stipulation is necessary: <br /> Stipulation No. 3 <br /> WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST REVISE THE <br /> SEDIMENT CONTROL PLANS FOR THE THREE PROPOSE) SEDIMENT PONDS AT TH" <br /> SITE OF THE NEW COAL PjtUCESSI(1G ''A�1STE EL!13ANKMENT. THE PLANS MUST b <br /> 6E REVISED TO INCLUDE ANON-CLUGGING, GATED UEWATERING DEVICE Y <br /> - LOCATED DIRECTLY ABOVE THE MAXIAIJI•1 STJNAGE OF EACH POND. <br /> Sediment Control - General <br /> c °Rule 4.05. 6(7) requires that a certification from a registered � � <br /> professional engineer, certifying that the sediment ponds have been <br /> constructed as designed, be submitted to the Division. The applicant ha <br /> sSN <br /> not submitted the required certification. Therefore, the following � � t <br /> stipulation is necessary: <br /> Stipulation No. 4 <br /> WITHIN SI%( �tUNTHS JF P1_RitIT ISSUAXE, THE PLR.NITTEE SHALL SU3c�I i Pit_ <br /> T'HE DIVISION ';E4TIFICATIUN FROM A „EGISTERED PROF 7:-SSIONAL _-NGI,�E__A, �I�A <br /> r L•. .3f1STPUCT`J HAVE BEAN <br /> ATTEST i?!G THAT i Ht Sc )['�iL.,1 C P�)�JI)'� � �_�_ ���_, <br /> BUILT AS DES116NED. CERTIF?CATIUN OF THOSE PONUS YET TO 3E �� <br /> CONSTRUCTED MUST dE S013MITTE0 IIMEJIATELf FOLLOWING CONSTRUCT:111' C� <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.