My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (262)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (262)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:08:18 AM
Creation date
6/21/2012 10:47:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Backfilling and Grading Plan for Preparation Plant Area
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Doug Bo4rnan -2- September 2, 1983 <br /> In addition to the above stipulations, several conditions were <br /> incorporated into the permit application. These were the result of <br /> stipulations in the draft findin;s document. Tne following are those <br /> tasks wh i car the Division believes wi 1 1 require respu:',ses in the near <br /> future. <br /> 1 . Prior to construction of the permanent Dutch Creek channel diversion, <br /> Mid-Continent must supply cross sections showing that the reconstructed <br /> channei is equal in capacity to :.he natural channel immediately upstream <br /> and downstream of the reconstructed channel . <br /> 2. A new ctate,nent of probable hydrologic consequences incorporating the <br /> effects of the road systeia on Dutch Creek and Coal Creek is due this <br /> fall. No specific date was set, therefore, the revised Statement must be <br /> submitteu by Jecember 21 , 1983. <br /> J. r, report on samplinJ of the revegetateu portion of the coal <br /> processing waste pile, to determine what deptn of topsoil is necessary to <br /> meet reveezation success standards, is due this fall. Subsequently, the <br /> pen-nit application may regjire revision to incorporate the finding. <br /> 4. The final condition, is Gnat reveyetation test plots must be <br /> estaulished this fall on the ,nine bench outslopes. As is laid out in the <br /> scope of worK, test plots should be set up for the east, north, and south <br /> aspects. The Division will verify the estanlisnment of tnese plots <br /> during regular inspections. <br /> I uelieve tnis covers all the stipulations ano special conditions which <br /> require action upon in the near future. Please don't hesitate to call if <br /> yuu nave any questions. <br /> Si` cerely, —1 <br /> Jim Herron <br /> Rec>�amation Specialist <br /> JH;th <br /> bloc. N"). 6291 <br />
The URL can be used to link to this page
Your browser does not support the video tag.