Laserfiche WebLink
Stipulation No. 2 <br /> THE PERMITTEE MUST CONDUCT A STATISTICALLY VALID REVEGETATION MONITORING <br /> PROGRAM EVERY OTHER YEAR FOLLOWING RECLAMATION OF THE FIRST SECTION OF <br /> THE NEW COAL PROCESSING WASTE EMBANKMENT. EACH ADDITIONAL AREA <br /> REVEGETATED MUST BE INCLUDED IN THE MONITORING PROGRAM DURING THE THIRD <br /> AND SUBSEQUENT GROWING SEASONS. THE SOUTH AND WEST ASPECTS MUST BE <br /> MONITORED SEPARATELY FROM THE NORTH AND EAST ASPECTS PLUS THE FLAT <br /> AREAS. MONITORING MUST CONTINUE ON ALL AREAS REVEGETATED UNTIL EITHER <br /> BOND IS RELEASED OR THE DIVISION APPROVES DISCONTINUATION OF MONITORING <br /> IN WRITING. <br /> IF REVEGETATION MONITORING SHOWS THAT REVEGETATION SUCCESS STANDARDS ARE <br /> NOT BEING MET, AND ARE NOT LIKELY TO BE MET IN SUBSEQUENT YEARS, THE <br /> PERMITTEE MUST MAKE WHATEVER CHANGES IN THE RECLAMATION PLAN THE DIVISION <br /> DEEMS APPROPRIATE AND IMPLEMENT THESE CHANGES IN THE AREAS WHERE <br /> REVEGETATION SUCCESS STANDARDS ARE NOT BEING MET. <br /> -5- <br />