My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (245)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (245)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:32:56 AM
Creation date
6/20/2012 3:05:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) TR-17 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Present System <br />1. "White pipe" conveys flow from underground workings to the <br />surface through the rock tunnel. <br />2. Mine water is flocculated on leaving the tunnel. <br />3. Mine water flows to the three -pond series of Outfall 016 for <br />settling prior to discharge to Dutch Creek. <br />Underground Sizing Screen <br />4. Underground grit screen removes coarse solids. <br />Water Treatment Plant <br />ATTACHMENT B <br />Process Flow Description <br />[See Process Flow Diagram - Attachment A] <br />Note: Numbers Correspond to Description <br />5. Mine water is routed (at valve box) through pipeline to <br />recycle sump /hydrocyclone of mine water treatment plant *. <br />6. Underflow from recycle sump /hydroclone, containing middling <br />solids, goes into the coal preparation plant cycle. <br />(Alternative: underflow goes to 001 ponds.) <br />Note: Calculations re. 001 ponds. Attachment E. <br />7. Overflow from the recycle sump /hydroclone, containing very <br />fine ( -200 mesh) solids proceeds to flocculation, then to <br />"finishing" (i.e. settling of fine solids) in sediment pond at <br />outfall 020 (Alternative: 001 pond(s) used for "finishing") <br />Note: Calculations re. 020 pond. Attachment D. <br />Calculations re. 001 ponds. Attachment E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.