Laserfiche WebLink
Included wJLth this report is a <br /> plan view of the proposed fill, and approximate cross-section at <br /> 100-foot stationing, as provided to Lincoln-DeVore by Mid Continent <br /> Resources . A rough calculation of the volume of the fill based <br /> on these sections indicated a potential yardage of about 500, 000 <br /> cubic yards of fill. This is equivalent to 360, 000 cubic yards <br /> of rock excavation for the tunnel . If our understanding of the <br /> planned amount of excavation is correct, the proposed fill should <br /> have more than sufficient vo3_u;,ie to provide for tunnel excavation <br /> spoil . <br /> It is believed that all pertinenIC <br /> points concerning the proposed fill have been covered in this <br /> report. Should soil types and conditions other than thosa out- <br /> lined here Ln De encounteroc, or lrilpi.erne_'iitod during construCtion <br /> on the site, these should be reported to Lincolri--DeVore so that <br /> changes in recommendations may be made, if necessary. Should <br /> questions arise or further information be needed, please feel <br /> free to contact our office. <br /> -11-- <br />