My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (244)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (244)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:33:27 AM
Creation date
6/20/2012 2:42:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Old Refuse Pile Design Reports
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION PROCEDURES AND MODIFICATIONS <br /> COAL REFUSE DISPOSAL FACILITY AND <br /> ROCK TUNNEL WASTE DISPOSAL FACILITY <br /> COAL BASIN MINES, REDSTONE, COLORADO <br /> FOR MID-CONTINENT RESOURCES, INC. <br /> 1. 0 INTRODUCTION <br /> Mid-Continent Resources, Inc. (Mid-Continent) operates two <br /> disposal facilities at their property. The coal refuse disposal <br /> facility is located in the immediate vicinity of the wash plant. <br /> The operation of this facility is scheduled only for a limited <br /> per_od of time as there is no substantial storage volume avail- <br /> able at the site. The second disposal facility serves for the <br /> deposition of the rock obtained during the excavation of the rock <br /> tunnel . <br /> The Mined Land Reclamation Divison (MLRD) directed Mid- <br /> Continent to determine whether the construction methods at both <br /> these disposal facilities comply with the previously established <br /> design criteria and to evaluate the necessary changes in the con- <br /> struction methods, if they do not comply with these criteria. <br /> Mid-Continent instructed Geo-Hydro Consulting, Inc. (Geo-Hydro) <br /> to perform the necessary work to comply with this requirement. <br /> 2. 0 SCGPE OF WORK <br /> The scope of this study is to review all available material <br /> related to the construction of both disposal facilities , to <br /> review the stability analyses performed for both of them, con- <br /> strliction procedures recommended in pertinent reports, and to re- <br /> view pertaining regulations of the State of Colorado . <br /> A field inspection of both facilities and a limited program <br /> of field and laboratory testing were proposed to obtain addition- <br /> al data on the conditions of both facilities. Finally, based on <br /> this work , recommendations should be made on any construction <br /> modifications , if necessary. These recommendations should deal <br /> mostly with the problems of stability, final slopes, compaction <br /> and future monitoring at both waste piles. <br /> 1 <br /> GEO-HYDRO CONSULTING,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.