Laserfiche WebLink
R <br /> 2.0 TOPSOIL <br /> 2.1 GENERAL <br /> 2.1.1 TOPSOIL FROM THE POND AREA HAS BEEN STRIPPEEDL ANDNOT STOCKPILED . <br /> CKPILED . <br /> STOCKPILED TOPSOIL AND OTHER MA <br /> MOVED <br /> UNTIL REQUIRED, FOR REDISTRIBUTION ON A REGRADED AREA. <br /> 2,2 REDISTRIBUTION <br /> 2.2. 1 AFTER FINAL GRADING AND BEFORE THE EBEACEMENT LOOSENEDFBYOMECHANIPSOIL CAL <br /> OTHER MATERIALS, REGRADED LAND SHALL <br /> MEANS TO A SUFFICIENT DEPTR�V�DELFORNROOTSPENETRATIONS' RE- <br /> LIEVE COMPACTION, AND TO P <br /> 2.2.2 TOPSOIL AND OTHER MATERIALS SHALL BE REDISTRIBUTED IN A MANNER <br /> THAT: <br /> (q) ACHIEVES AN APPROXITaININGILANDoUSES STABLE <br /> CONTOURSESTHE <br /> CONSISTENT WITH POS <br /> SURFACE WATER DRAINAGE SYSTEM AND REQUIREMENTS OF RE- <br /> VEGETATION; <br /> (B) PREVENTS EXCESS COMPACTION AND CONTAMINATION OF TOPSOIL: <br /> (C) MINIMIZES DETERIORAATION OF OF THE THE B.O LOIICAL, CHEMICAL, <br /> AND PHYSICAL PROPERES <br /> _ (D) PROTECTS THE TOPSOIL <br /> FROM <br /> AND BEFORE AND <br /> ANDWATER <br /> AFTEREROSION <br /> IS . <br /> DURING REDISTRIBUTON <br /> SEEDED AND PLANTED <br /> 3,0 INSPECTIONS <br /> 3.1 SEDIMENTATION PONDS <br /> 3.1,1 THE SEDIMENTATION PONDS SHALL BE SAEQUAEDLIFIEDNREG�STEREDTiOi� <br /> AND CERTIFIED AFTER CONSTRUCTION BY <br /> PROFESSIONAL ENGINEER, OR PERSON APPROVED BY CMLRD . <br /> 3,1.2 CERTIFICATION OF THE CONSTRUCTED <br /> DIVISON SHALL <br /> IMMEDIATELYAFORDED LLOW�NG <br /> COLORADO MINED LAND RECLAMATION <br /> CONSTRUCTION. <br />