Laserfiche WebLink
Mid-Continent Reclamation Cost Estimates <br /> The following list represents the estimated costs of <br /> the major activities required in field reclamation projects : <br /> 1 . Removal of Structures $ 1 , 000/day <br /> 2 , Sealing 400/day <br /> 3 . Rough Grading 300/Ac <br /> 4 . Smooth Grading 100/Ac . <br /> S . Scarifying 100/Ac . <br /> 6 . Amendments/Fertilizer 100/Ac <br /> 7•. - Planting Seed Broadcast 100/Ac . <br /> Hydromulch 200/Ac <br /> 8 . Planting Shrubs/trees 200/Ac . <br /> 9 . Mulch Tackif iers 200/Ac.:. <br /> The following are the total estimated costs involving <br /> all five mines , tunnel, preparation plant, roads and the <br /> Carbondale train loadout. <br /> 1 Mine <br /> Area---17 Acres , <br /> Structures removal & Sealing 104 , 000 <br /> Rough and Smooth Grading <br /> and Scarifying 8 , 500 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 13 ;600 <br /> Roads --- 17 Acres 22, 100 <br /> . 148 , 200 <br /> No . 2 Mine <br /> Area --- 13 Acres <br /> Structures Removal and <br /> Sealing 60, 000 <br /> Rough and Smooth Grading and <br /> Scarifying 6, 500 <br /> Amendments Fertilizer, Planting <br /> and ;Mulching � 10, 400 <br /> Roads (included with #1 Mine) <br /> 76 , 900 <br /> . 17 . 2 (Chap . V) <br />