My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (239)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (239)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:24:14 AM
Creation date
6/20/2012 11:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1982 Technical Revisions Rock Tunnel Trash Pile
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t` <br /> N 0 DEPARTMENT OF NATURAL RESOURCES <br /> * * David H.Getches,Executive Director <br /> "'4 * MINED LAND RECLAMATION DIVISION <br /> 1876 DAVID C.SHELTON, Director <br /> Richard D.Lamm <br /> Governor <br /> DATE: October 16, 1986 <br /> TO: Candace Thompson n <br /> FROM: Jeffery Deckler <br /> CT �ti,��_1 <br /> RE: MID-CONTINENT TUNNEL POND EXPANSION, TECHNICAL REVISION, <br /> File No. C-8144ffl <br /> C17 <br /> I have reviewed the bond calculations for the above referenced revision and <br /> have the following comments. <br /> 1 . The total volume appears to have been miscalculated. Using the <br /> cross-sectional areas provided, the Division calculates approximately <br /> 22,000 c.y. to be moved, rather than the 10,000 c.y, in the submittal . <br /> 2. The Division has estimated dozer productions as follows: <br /> Unadjusted production 285 LCY hr <br /> Operator .75 <br /> Job Efficiency .P-3 <br /> Grade .70 <br /> 124.2 LCY hr <br /> The earth moving costs are therefore, <br /> 22000 LCY X $118.00/hr = $20,902 <br /> 124.2 LCY/hr <br /> 3. Revegetation unit costs have not been agreed to as of this time with <br /> respect to the mid-term review. However, due to the small area <br /> involved, the Division will accept the figure of $1 ,375.00/ac, subject <br /> to future revision upon resolution of this issue. <br /> The total cost for the revision should, therefore, be <br /> Earthwork 20,902 <br /> Revegetation 8,650 <br /> Total 29,5r7 <br /> 4. There is no discussion of topsoil salvage and redistribution for this <br /> revision. If topsoil exists in the expansion area this should be <br /> required. In addition, bond calculations for the buildings have not <br /> been addressed. Unless Mid-Continent will commit to the demolition of <br /> the current shop/bathhouse complex upon completion of the new <br /> structures, both sets of buildings would have to be bonded. <br /> /iml <br /> 453OF <br /> 423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.