Laserfiche WebLink
Sediment Ponds (Revegetation costs included in cost for associated disturbed area) <br /> Backfilling and Grading $ 5,396.00 <br /> Preparation Plant Area <br /> Area - 35 Acres (See Post-Mining Land Use) <br /> Structures Removal $120,000.00 <br /> Rough and Smooth Grading -and <br /> Scarifying 17,500.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 28,000.00 <br /> Roads - 5.0 Acres 6,500.00 <br /> $171,500.00 <br /> Carbondale Train Loadout (See Post-Mining Land Use) <br /> Area - 5 Acres <br /> Structures Removal $ 30,000.00 ` <br /> Rough and Smooth Grading and <br /> Scarifying 2,500.00 <br /> Amendments, Fertilizers, <br /> Planting•& Mulching 4,000.00 <br /> $ 36,500.00 <br /> Roads Misc. - 5 days <br /> Area - 26 Acres <br /> Structures Removal $ 5,000.00 <br /> Rough and Smooth Grading and <br /> Scarifying 181,717.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 20,800.00 <br /> $207,517.00 <br /> Power Lines Misc. (No revegetation required) <br /> Structures Removal (10 days) $ 20,000.00 <br /> TOTALS <br /> No. 1 Mine $201,470.00 <br /> No: 2 Mine 91,132.00 <br /> No. 3 Mine 588,760.00 <br /> No. 4 Mine 305,894.00 <br /> No. 5 Mine 148,455.00 <br /> Tunnel 179,030.00 <br /> Preparation Plant 171,500.00 <br /> Train Loadout 36,500.00 <br /> Roads, Misc. 207,517.00 <br /> Power Lines, Misc. 20,000.00 <br /> Topsoiling 14,494.00 <br /> Sediment Ponds 5,396.00 <br /> TOTAL $1,97.0 ,148.00 <br /> s_]91 L9 _ <br />