My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (239)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (239)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:24:14 AM
Creation date
6/20/2012 11:20:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1982 Technical Revisions Rock Tunnel Trash Pile
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine No. 4 <br /> The Mine No. 4 pad area is 2.86 acres in size and must be backfilled to an average <br /> depth of 20.25 feet. A D9U would have an average push distance of 400 feet and <br /> would be required to move 93,436 yd3 of material. The unadjusted production rate <br /> for a 400-foot push distance is 425 LCY/hr. The following are the production <br /> factors that apply to this operation: <br /> Condition Factor <br /> Average Operator 0.75 <br /> Rock Material 0.70 <br /> 50 minute working hour 0.84 <br /> Grade Factor 29% 0.42 <br /> Altitude deration 0.94 <br /> Overall Factor 0.17 <br /> Under these conditions, a D9U has a production rate of 72 LCY/hr. and would require <br /> 1,297 hours .to complete at the following cost: <br /> 1 - D9U dozer: 1,297 hours @ $127.00/hr. = $164,719.00 ` <br /> 1 - Operator: 1,297 hours @ $ 15.00/hr. = $ 19,455.00 <br /> TOTAL COST: $184,174.00 <br /> 19 -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.