My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (254)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (254)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:55:34 AM
Creation date
6/20/2012 10:06:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1994 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9pt&iM(7 , <br /> =i United States Forest White River Sopris Ranger District <br /> �� Department of Service National P.O. Box 309 <br /> Agriculture Forest Carbondale, CO 81623 <br /> (303)963-2266 <br /> Reply: 2720/2800 <br /> Date: April-13, 1994 <br /> Michael B. Long <br /> Division Geology and Minerals <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Dear Mr. Long: <br /> As a result of the meeting on February 3, 1994, with personnel from the Office <br /> of Surface Mining, U. S. Forest Service, and your agency concerning the status <br /> of roads on National Forest during the reclamation of Coal Basin, we have <br /> addressed and clarified our position on how we would like the roads on National <br /> Forest addressed during reclamation. <br /> There is in effect at this time an approved reclamation plan submitted as a <br /> part of Mid-Continent Resource's 1987 application to renew the permit for their <br /> Coal Basin mining operations. Since that time, we have taken another and <br /> fresher look as to how the National Forest portion of Coal Basin should look <br /> after reclamation is finished. This look has been tempered by the following <br /> facts. Our management direction is now leaning towards a valley that is open <br /> to a backcountry type of recreation. Our fiscal constraints due to reduced <br /> budgets are now deep enough that we need to look at all expenditures for <br /> reductions including road maintenance ones. <br /> Additionally, when the reclamation plan was reviewed, it was anticipated that <br /> reclamation would be not be done until the coal reserves had been mined at a <br /> point well into the future. It was thought that plenty of future opportunities <br /> would present themselves to provide more concrete input as reclamation looked <br /> more feasible. <br /> With these facts in mind, we wish to have the following items considered as <br /> reclamation activities continue in Coal Basin: <br /> 1 . We do not need or want a road system in Coal Basin. Management area <br /> direction in the Forest Plan is emphasis on non-motorized recreation <br /> opportunities. Currently, I have one application for access to a private <br /> parcel on hand, but for the general area in Coal Basin, there is not an <br /> identified need for motorized road access to the area above the trailhead. <br /> I also do not have a desire to assume any additional road responsibilities <br /> that will require the resources of the American public to maintain after <br /> reclamation is finished. <br /> 2. We would like to have a naturally functioning drainage system where <br /> man-caused environmental damage is not occurring in the ecosystem such as <br /> erosion leading to soil loading to the streams in Coal Basin. <br /> Caring for the Land and Serving People <br /> FS-6200-28(7-82) <br />
The URL can be used to link to this page
Your browser does not support the video tag.