Estimate 2 : same as above plus owning cost (assumes paying a <br /> contractor ) . <br /> 9 weeks x 40 hrs/week x $107 . 92/hr = $38 , 851 <br /> e and f) 10 Yard Dump Truck <br /> Two dump trucks wi 1 1 be needed for 4 weeks to topsoil both mines #3 <br /> and #4 and their respective roads . The roads only require subsoil <br /> in certain spots where the mancos shale surface would not <br /> revegetate unless some type of subsoil material is provided for <br /> rooting. <br /> Although two trucks of this type do exist at the site, some repairs <br /> are needed to at least one truck and the reliability of the trucks <br /> are questionable. Therefore, it will be assumed that both trucks <br /> will be obtained from a contractor . Past experience has shown that <br /> trucks of this type are readily available for a cost ( including <br /> contractor profit) of $50 . 00 per hour . <br /> Cost : 4 weeks x 40 hrs/week x 2 trucks x $50/hr = $16 ,000 . <br /> g) Salvage Crew <br /> The salvage operations by the independent contractor can continue <br /> independent of the reclamation operations proposed for the 1994 <br /> season although the remaining conveyor at the Sutey Pile should be <br /> removed as quickly as possible and the remaining items at Mine #4 <br /> should be removed by early August . <br /> Also, all items from Mines #1 and #2 should be removed by the end <br /> of the construction season so that these areas can be reclaimed in <br /> the early part of the 1995 season . <br /> There are no costs associated with the salvage operations since <br /> this contractor is paid from the proceeds of the sale of the <br /> equipment . <br />