Laserfiche WebLink
Colorado Division of Minerals and Geology, <br /> ESTIMATING FORM - SCRAPER WORK <br /> --------------------- --------- <br /> TASK NO. 1 PREP. BY: GL PERMIT" NO. C-81-017 <br /> DATE 12/06/93 FILENAME : C017-1 OPERATION: Coal Basin Mine <br /> PERMIT ACTION Sutey Pile Reclamation <br /> TASK DESCRIPTION Comet Estimate for Complete Reclamation <br /> HOURLY EQUIPMENT COSTS: <br /> Single , Double or Triple <br /> County: PITKIN Labor Zone 2 Shifts . S <br /> Equipment Descriptions <br /> Scraper team make-up :CAT 631D with ROPS cab <br /> Road maint. - Grader :N/A <br /> - Water T. :N/A <br /> Scraper Team Road Maintenance <br /> Scraper Dozer(s) Grader Water truck <br /> Equipment Filename:631D-ROP N/A N/A <br /> Utilization on ,lob: 90% N/A N/A N/A <br /> Cost Breakdown: <br /> Ownership cost/hr: $43. 33 N/A4 N/A N/A <br /> Operating cost/hr : $69.61 N/A 77.3f N/A N/A <br /> Operator cost/hr: $20. 56 N/A N/A N/A <br /> -------- -------- --------- --------- - <br /> Unit subtotals: $133. 50 N/A N/A N/A <br /> Scraper team subtotal $133.SO Maint. subtotal N/A <br /> Total Work Team Cost/Hr : $133.50 <br /> MATERIAL QUANTITIES: <br /> Beg. <br /> Volume : 3S283 BCY <br /> Cu . Yd. Swell Loose <br /> Volume: 35, 283 BCY Factor: 1 .230 Volume: 43,398 LCY <br /> Source of quantity take-off :Current pictures of pile <br /> Source of est . swell tactor: table for loam <br />