Laserfiche WebLink
Natural timber will be undisturbed. <br /> Area 3. <br /> A lower, relatively flat yard area formerly used for coal loading and storagE <br /> Sector 3A <br /> =i <br /> The outwash material in the lower yard area, together with material from the AML project, will be placed <br /> against the hillside, (Sector 3-A), although the western-most side of the fill slope above will be avoided as <br /> a potential avalanche path. The fill will extend outward toward the concrete bases of the (former) bin. <br /> Fill material from the hillside above will be pushed down, over the coal material. The angle of the slope <br /> will be moderated with terraces, constructed as a dozer path when material is pushed over the coal. <br />