Laserfiche WebLink
f. <br /> - - 4-, <br /> r - <br /> - � Drainage from the portal will be routed westward, along a d <br /> running around the hillside to intersect with Ditch Segment <br /> L . <br /> Sector 2A _ <br /> y <br /> The uppermost portion of coal material on the hillside will <br /> - be pushed downward to the toe. <br /> Material from the fill above will be pushed down, over the coal. <br /> Ditch Segment A �Y <br /> 01 <br /> _� �:, �r"fir,, '_• �, :s. <br /> a � Ditch Segment B <br /> The roadway/ditch which presently extends down from the west toward the yard will serve as a ditch <br /> below the fill area (Ditch Segment A), continuing on around the outermost(northerly) edge of the yard <br /> area (Ditch Segment B), then leading to the sediment pond(Ditch Segment C). A ditch will be <br /> constructed below the (lower) draining portal to convey flow around the hill, then to intersect with Ditch A. <br />