KUDLK 1 LGLI NL Y ILL No .SUJ-y4J-tJUJ .,an . 1S .y3 15 : 15 P .03 <br /> Trucks(2) 2 daystl0 1800 <br /> hours:c 2 x <br /> 50=1 a,30 <br /> Dozer Route/spac 1 day/$ 330 <br /> e cleared hours x <br /> for001 30=240 <br /> ponds= <br /> add 3 hours <br /> for snowfall <br /> x30=90 <br /> 7 revel <br /> To/From <br /> Duns: <br /> retween <br /> ands <br /> Dragline 4 hours toffrom 1300 <br /> mine x 100=400 <br /> 3 hours moving <br /> 3 times between <br /> pond locations+ <br /> =9 hours x 100 <br /> = 000 <br /> .� Trucks (2) 2 hours x 2 200 <br /> trucks x SO-200 <br /> To $18,380 <br /> 016 Pond' <br /> Est. time: 4 days. <br /> The uppermost pond requires cleaning. The lower two ponds do not. <br /> The dragline is required to dredge the pond. As this pond does not have a suitable <br /> area to place pond cleanings, the muck will have to be transported to the tunnel pile, <br /> and there spread. This requires the use of at least two trucks, which in tum dictates <br /> use of an experienced dragline operator to load material into the trucks without spillage <br /> or damage to the trucks. <br /> The road to the tunnel ponds is being kept clear of snow, as required, to allow access. <br /> Some additional work is required when the dragline is on-site to allow it to access the <br /> ponds. The dozer is required for this job. <br /> ' Notice of Violation C-92-041 requires clean-out of this pond by March 20, 1993. <br /> 2 <br />