Laserfiche WebLink
.S' y :r.+.• , ` -yam >N' �'%k` • <br /> Colorado Divis"ion''-.of`! Mi'neralswand�Geolo x <br /> -..�.w�•wwww w.wwwww.ww w• • • • •w•.•w w�• w w w w h, <br /> ESTIMATING FORM - SCRAPER WORK <br /> TASK NO. 1 PREP. BY: GL PERMIT NO. C-81-017 <br /> DATE 12/06/93 FILENAME: C017-1 OPERATION: Coal Basin Mines <br /> PERMIT ACTION Sutey Pile Reclamation <br /> TASK DESCRIPTION Cost Estimate for Complete Reclamation <br /> HOURLY EQUIPMENT COSTS: <br /> Single, Double or Triple <br /> County : PITKIN Labor Zone : 2 Shifts S <br /> Equipment Descriptions <br /> Scraper team make-up :CAT 631D with ROPS cab <br /> Road maint. - Grader :N/A <br /> - Water T . :N/A <br /> Scraper Team Road Maintenance <br /> Scraper Dozer(s) Grader Water truck <br /> Equipment Filename:631D-ROP N/A N/A <br /> Utilization on job: 90% N/A N/A N/A <br /> Cost Breakdown: <br /> Ownership cost/hr: $43.33 N/A N/A N/A <br /> Operating cost/hr: $69.61 N/A 77,3f N/A N/A <br /> Operator cost/hr: $20.56 N/A N/A N/A <br /> -------- -------- --------- -------- <br /> Unit subtotals: $133. 50 N/A N/A N/A <br /> Scraper team subtotal $133. 50 Maint. subtotal N/A <br /> Total Work Team Cost/Hr : $133. 50 <br /> MATERIAL QUANTITIES: <br /> Beg. <br /> Volume: 35283 BCY <br /> Cu . Yd. Swell Loose v3 <br /> Volume: 35,283 BCY Factor: 1 .230 Volume: 43,398 LCY <br /> Source of quantity take-off :Current pictures of pile <br /> Source of est. swell factor: table for loam <br />