My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-10-19_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1994-10-19_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2021 8:25:34 PM
Creation date
6/20/2012 7:48:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/19/1994
Doc Name
Cement Creek Conjunctive Flow Characterization
From
Golder Associates
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 1994 -4- 933-2713.003 <br /> 4.0 HYDROGEOLOGY <br /> 4.1 Field Activities <br /> 4.1.1 Piezometer Installation <br /> Piezometers were installed in five of the seven boreholes to allow water level monitoring. <br /> Two-inch diameter polyvinylchloride (PVC) piezometers were installed in boreholes BH-1, BH- <br /> 2, BH-3, BH-5, and BH-6. Piezometers were not installed in boreholes BH-lA and BH-4 <br /> because they were located in the middle of a roadway and the creek, respectively. Boreholes <br /> BH-lA and BH-4 were drilled principally to obtain geologic data. <br /> Piezometers were completed using 10-feet of screen which was generally placed adjacent to <br /> sandy gravel lenses. A sand pack was placed in each hole. The sand pack extended from 5 feet <br /> below the bottom of the screen to 8 feet below ground surface. Table 1 presents the piezometer <br /> installation data. <br /> Groundwater in BH-3 exhibited flowing artesian conditions after piezometer installation. Water <br /> flowed from BH-3 approximately 1.5 feet above the ground after completion. The presence of <br /> flowing artesian conditions in the BH-3 sandy gravel zone indicates that it is not hydraulically <br /> connected to the sandy gravel zone in BH-2, which did not exhibit flowing artesian conditions. <br /> At the end of the field investigation, the piezometer in BH-3 was removed and the borehole was <br /> backfilled. <br /> The water table elevation is shown in Table 1. <br /> Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.