My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (234)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (234)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:17:12 AM
Creation date
6/19/2012 2:59:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1997 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5TATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources P P r4 7, <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone (303)866-3567 volt <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> MEMO <br /> Roy Romer <br /> Governor <br /> February 12, 1997 <br /> James S Lochhead <br /> CONFIDENTIAL Executive Director <br /> Michael B Long <br /> TO: Michael Long, David Bucknam Division Director <br /> FROM: Steve Renner <br /> .e <br /> RE: 1997 Coal Basin Mine Reclamation <br /> In my 1996 Annual Report, I had proposed that the Division <br /> accomplish four reclamation projects in 1997. These are the <br /> Warehouse Project, Roads B, C, D Project, Outslope Preparation <br /> Project and a Steep Slope Revegetation Project. This memo <br /> discusses the Road, Outslope Preparation and Outslope Revegetation <br /> Proposals. The Warehouse Project was addressed in a February 11, <br /> 1997 memo. <br /> The attached narrative briefly describes the areas to be reclaimed <br /> under the scope of the each Proposal, the approved reclamation plan <br /> for each work area, and the reclamation concept proposed for <br /> construction at each area. An alternative reclamation concept, <br /> where appropriate, is provided for your consideration. I am <br /> requesting that you provide any comments which you may have, and <br /> ultimately approve of the proposed reclamation concepts by March 1, <br /> 1997 in order that I may draft the appropriate specifications. <br /> Careful consideration needs to be given to the scope of these three <br /> Projects before preparing bid specifications. I had originally <br /> proposed accomplishing reclamation of all mine bench outslopes and <br /> of all remaining haul roads west of the Rock Tunnel. Given funding <br /> constraints, it is suggested that an abbreviated reclamation <br /> schedule be implemented in the upper portions of Coal Basin in 1997 <br /> in order that long term, cost effective and sustainable reclamation <br /> is accomplished. <br /> cc: Jim McArdle <br /> Cheryl Linden <br /> C:\wp51\midc\bids\97wrkpin <br />
The URL can be used to link to this page
Your browser does not support the video tag.